Acceptance criteria say "to spec" or "as drawing"
A reviewer cannot witness "to spec". Each check needs the actual clause and the measurable value: the tolerance, the torque, the pressure, the standard and edition. Our worked ITP shows criteria written the way a Tier 1 reviewer signs off first time.