Aerial view of a large building under construction with cranes, deliveries and laydown areas
Guides

Construction quality guides

Practical guides on the documents that get reviewed, written by the people who review them.

Engineer in hard hat, safety glasses and hi-vis completing an inspection record on a clipboardITP Template for Construction: Why ITPs Get RejectedWhat a construction inspection and test plan must contain, the five reasons reviewers reject ITPs, and a free worked example to measure yours against. Engineer in a hard hat working at a laptop over drawings in a site officeISO 9001 for Construction CompaniesWhat ISO 9001:2015 actually requires of a UK construction contractor, the documents an auditor expects, and what a bought-in QMS can and cannot do. Two engineers in hard hats reviewing a drawing in a site officeProject Quality Plan Template to ISO 10005How to structure a construction project quality plan to ISO 10005:2018, section by section, and why Tier 1 reviewers reject the ones they are sent. Two engineers in hard hats, safety glasses and hi-vis inspecting a wall during a site walkConstruction Toolbox Talks That Stand Up to an AuditorHow to deliver a construction toolbox talk that satisfies MHSWR 1999 and CDM 2015, what the record must show, and the mistakes auditors find in the file. Aerial view of an excavator cutting a formation on an earthworks siteRAMS Template for ConstructionWhat a construction RAMS must contain to be accepted by a principal contractor: risk assessment structure, method statement sequence, and the reasons RAMS get rejected. Keys being handed over at completionConstruction Handover Documents ChecklistA checklist of construction handover documents: O&M manuals, as-builts, the CDM health and safety file, Regulation 38 information and the certificates by discipline. Circulating pump, valves and temperature gauge on a heating manifold awaiting commissioningCommissioning Plan Template for Building ServicesHow to structure a building services commissioning plan to CIBSE Commissioning Code M, section by section, with the ITPs, test records and witnessing behind it. Laptop, notebook, pen and hard hat on a site office deskThe Construction Site Diary: Why It Wins ClaimsWhy the construction site diary decides delay and disruption claims, what a diary entry must record every day, and the habits that make it stand up a year later. Two mobile crane booms extended against a blue skyISO 45001 for Construction CompaniesWhat ISO 45001:2018 asks of a UK contractor, how it sits on top of HSWA and CDM 2015, what an auditor expects, and what a bought-in system can and cannot do. Tracked excavator stripping topsoil on a greenfield siteISO 14001 for Construction: The EMS on SiteWhat ISO 14001:2015 requires of a UK contractor, the compliance obligations an auditor expects on the register, and how the system and the site CEMP fit together. Concrete frame with edge protection and scaffolding on a residential block under constructionTemporary Works Register to BS 5975-1:2024What a temporary works register must record under BS 5975-1:2024 and CDM 2015, the status ladder from brief to strike, and the columns that catch overdue checks. Residential tower under construction in London with a luffing tower craneGateway 2 Building Safety Act ChecklistWhat a Gateway 2 application for a higher-risk building must contain, how the Building Safety Regulator decides it, and what the contractor needs before and after. Two engineers in hard hats and hi-vis walking across an earthworks siteSubcontractor PQQ Questions for ConstructionThe questions a subcontractor PQQ should ask under each Common Assessment Standard area, the pass/fail gates, a defensible scoring method, and the checks after. Quality engineer in hard hat and hi-vis with a clipboard in front of a steel frameConstruction Quality Audit ChecklistHow to build a construction quality audit checklist: audit versus inspection, evidence-led questions cited to the standard, scoring, grading findings and close-out. Pile cap reinforcement fixed and ready for pre-pour inspectionNon-Conformance Report (NCR) in ConstructionWhat a construction non-conformance report must record, the five dispositions and who authorises each, NCR versus corrective action, and why most are closed wrongly. Site engineer in hard hat and hi-vis checking inspection records on a tabletConstruction Quality Alerts and Lessons LearnedWhat a construction quality alert is, when to issue one, the one-page format, and how a lessons learned register turns NCR trends into briefings for the next project. Palletised blocks delivered to siteCertificate of Conformity Tracker for ConstructionWhich materials certificate proves what: certificates of conformity, Declarations of Performance, UKCA and CE marking, mill certificates, and how to track them. Row of completed new-build homesNew Homes Quality Code Pre-Completion InspectionWhat the New Homes Quality Code V2 requires at pre-completion inspection, the developer's own inspection first, the certificates, the demonstration and the clocks after.