Document systems written by the person who reviews them.
Editable Word and Excel quality documentation for UK construction contractors. Every template comes with a fully worked example, cited to the governing standard. One payment, instant download, no subscription.
These are not generic templates. They are built on quality systems implemented on real UK projects by a chartered professional who has taken a contractor’s business through ISO 9001 certification and set up the quality regimes on programmes including Crossrail, the Woodsmith Mine and Transport for Wales.
Certification. These documents support your route to certification. They do not confer it. ISO 9001:2015 certification can only be granted by a UKAS-accredited certification body following audit.
Products
The range
Start with the free ITP. If it is not obviously better than what you can download elsewhere, do not buy anything else. The packs are grouped by what they are for; use the category bar above to jump to one.
12 months of email supportFrom a chartered construction professional
Free updates when standards changeRe-issued to your Payhip download page
Not as described? Put right or refundedFaulty file or missing document: fixed or refunded within 7 days
Start free
Three complete documents for an email address: a worked ITP, a worked CDM 2015 construction phase plan and an ISO 9001 readiness checklist. Judge the standard before you spend anything.
3 products
Every StructAssure product starts from the same test: would a Tier 1 reviewer accept this document as submitted? The free inspection and test plan template lets you apply that test before you spend anything. It is a complete construction ITP for LV distribution boards, supplied as a blank Excel template, a 26-line worked example cited to BS 7671:2018+A4:2026 and BS EN IEC 61439, and a one-page guidance sheet on the five reasons ITPs are returned: acceptance criteria that cannot be measured, missing specification references, hold points that are not hold points, no named verifying record and absent sign-off columns. Use it as an ITP template on a live job, or simply compare it line for line with the inspection and test plan you use today. If it is not clearly better, do not buy anything else here. It costs an email address and the download is immediate.
Inspection & Test Plan · LV distribution boards
Free ITP: LV Distribution Boards
Freeemail address only
One complete inspection and test plan: blank template, a 26-line worked example and a guidance sheet on the five reasons ITPs get returned. Judge the standard before you spend anything.
Blank ITP template (Excel)
Fully worked example, every line cited
Guidance sheet: why ITPs get rejected
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Free · CDM 2015 construction phase plan · worked example
Construction Phase Plan: Worked Example
Freeemail address only
A full construction phase plan completed for a real project, to the standard CDM 2015 regulation 12 and HSE guidance L153 expect. See exactly what each section should contain before you write your own.
Complete worked construction phase plan (Word)
Every CDM 2015 section filled in
The free companion to the editable template
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Where does your quality system stand against ISO 9001:2015? A clause-by-clause readiness checklist a UK contractor can work through in an afternoon, scoring each requirement and listing the evidence a certification auditor will ask to see.
Clause-by-clause checklist (Word)
Readiness score and evidence prompt on every line
Shows the gap to certification before you commit
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The ISO 9001 system and its 2026 transition kit, project quality plan, ITP libraries with register and dashboard, check sheets, briefing sheets, commissioning plan and tracker, audit, records, materials control and quality alerts: the documents a reviewer asks for.
20 products
This is the core of the range: the quality documents a main contractor, client or certification auditor actually asks a UK construction contractor to produce. The ISO 9001 Construction QMS is a complete quality management system written for construction rather than adapted from a generic manufacturing template, with a clause-mapped quality manual, 21 procedures, 20 forms and 19 live registers. The Project Quality Plan follows ISO 10005:2018 and comes with a fully worked M&E example. Four ITP libraries give 50 inspection and test plans across M&E, civils, structural, architectural, specialist trades and renewables, each as a template plus a worked example with every acceptance criterion cited to the governing British Standard at its current edition. The activity check sheets are the site records those ITPs call for, line for line. Around them sit the task briefing sheets, commissioning plans and test records, quality audit and reporting tools, construction records library, materials and certificate of conformity control and a quality alert library. All native Word and Excel, unlocked.
ISO 9001:2015 · UK construction · 2026 transition kit included
ISO 9001 Construction QMS
£695one payment
The complete documented system for a UK contractor: quality manual, 21 procedures, 20 forms, 19 registers, internal audit programme, gap analysis tool and an implementation roadmap. 64 documents, independently audited against the standard before release.
Clause-mapped quality manual and policy
21 controlled procedures, construction-specific
20 forms and 19 registers (Word and Excel, unlocked)
Audit programme, checklists and management review pack
Gap analysis tool and 90-day implementation plan
ISO 9001:2026 Transition Kit included free, with its Revision 02 to follow
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
ISO 9001:2026 was published on 16 September 2026. The kit takes a 2015-edition system through the transition without a rewrite: what changed, the 2015-to-2026 clause cross-walk mapped to the QMS document numbers, a weighted gap analysis, a transition plan with worked example and an audit checklist supplement.
Edition statement and clause cross-walk with confidence flags
Transition gap analysis tool and audit checklist supplement
Transition plan template and worked example with process flowchart
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The plan every contract asks for, as a blank template and as a fully worked example completed for a real-world M&E package to the standard a Tier 1 reviewer expects. Cross-referenced to the full QMS.
Blank PQP template (Word)
Fully worked M&E example
Cross-referenced to the QMS procedures and forms
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Thirteen M&E ITPs, each as a template and a worked example: boards, containment, cabling, lighting, emergency lighting, fire alarm, small power, earthing, ductwork and AHUs, LTHW/CHW pipework, domestic water, BMS and VRF. Every line cited to the current edition of the governing standard.
13 ITPs, template plus worked example
Acceptance criteria cited to the governing standard on every line (BS 7671:2018+A4:2026 for electrical scope)
Hold and witness points identified
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Twelve ITPs covering earthworks, piling, formwork, reinforcement, concrete, structural steel, drainage, masonry, flat roofing, screeds and floors, dry lining and external works. Template plus worked example for each, every line cited.
12 ITPs, template plus worked example
Acceptance criteria cited to the governing British Standards and Eurocodes
Same structure as the M&E pack, so the two sit together
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Cladding and rainscreen, curtain walling, timber frame and CLT, precast erection, waterproofing and basements, flexible pavements, landscaping, structured cabling, lifts, lightning protection, sprinklers, above-ground drainage and commercial gas. Template plus worked example in every workbook, 250 lines.
13 ITPs, template + worked example each
Highways ITP follows the September 2025 MCHW restructure
Every standard at its current edition, independently reviewed
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
ITP Library Volume 3 - Renewables and Specialist Services
£195
Solar PV, battery storage, EV charging, generators and UPS, access control and CCTV, PA and voice alarm, data centre fit-out, air source heat pumps, kitchen extract, medical gas, dry and wet risers and smoke control. Template plus worked example in every workbook.
12 ITPs for the systems modern buildings carry
MCS, ENA G98/G99, IET Codes of Practice, HTM 02-01 (2026), BS EN 12101
Corrected after an independent M&E review
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The master ITP register pre-loaded with all 60 StructAssure ITPs, a weekly quality dashboard with editable RAG thresholds, trend table and native charts, and a monthly quality report template with a worked example reconciled to the register figures.
Printable site check sheets for every M&E, civils, structural and architectural activity in the two ITP libraries: 232 check items, line-for-line from the ITPs, with pass/fail/N/A, measured values, NCR link and three-party sign-off.
25 activity check sheets, 232 items
Same criteria and citations as the ITP the reviewer approved
Measured-value fields and NCR cross-reference
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The site record for every Volume 2 ITP, line for line: 191 check items with Read Me, blank template and worked example in every workbook, plus a combined workbook.
The site record for every Volume 3 ITP, line for line: 159 check items with Read Me, blank template and worked example in every workbook, plus a combined workbook.
Printable check sheets for the eight commissioning ITPs: LV testing, fire alarm, emergency lighting, air and water systems, domestic water, BMS and integrated systems tests. Every line carries the acceptance limit from the ITP, a measured-value field and three-party sign-off.
8 commissioning check sheets, line-for-line from the ITPs
Acceptance limits and measured values on the sheet
Witness, contractor and client sign-off with NCR cross-reference
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Task Briefing Sheets · template + 3 worked examples
Task Briefing Sheets
£145
The pre-task brief that ties the method statement, the ITP hold points and the crew's competence together. Blank template plus worked examples for electrical terminations, pile cap reinforcement and AHU pre-commissioning.
Blank TBS template (Word) with guidance in every field
Three worked examples: electrical, civils, mechanical
Every hold point is a real ITP line, cited by number
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Twelve completed pre-task briefs for structural steel, precast, blockwork, roofing, deep drainage, fire-stopping, lift shafts, cable pulling, lightning protection, scaffold handover, hot works and chilled water testing, plus the Volume 2 template and index. Every hold point is a real ITP line.
Volume 2 template with guidance in every field
12 worked examples across civils, structure, envelope, M&E and access
Cross-referenced to the RAMS Library, ITP libraries and permits by document number
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Commissioning & Test Plan Pack · 8 ITPs + 11 test records
Commissioning & Test Plan Pack
£245
Commissioning ITPs for LV testing, fire alarm, emergency lighting, air and water systems, domestic water, BMS and integrated systems tests; eleven printable test record forms with the acceptance limits on the sheet; commissioning plan and witness record.
8 commissioning ITPs, template plus worked example
11 test record forms with pass/fail and sign-off
Commissioning plan template, worked example and witness record
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Every building-services system tracked through five gates, a witness schedule with 48-hour notice logic, an outstanding items list that ages itself, a handover readiness dashboard with the 21 records a handover needs, and a weekly commissioning report with a fully worked example.
Five-gate tracker pre-loaded with 20 worked systems
Witness schedule, notice log and outstanding items with ageing bands
Handover readiness dashboard and weekly report template with worked example
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Ten trade audit checklists with scoring, supplier and process audits, audit programme builder, findings tracker, root cause worksheet, monthly quality report, KPI dashboard with charts, PowerPoint deck builder, right-first-time tracker, NCR Pareto, management review input pack - all driven from one data set.
10 scored audit checklists by trade
KPI dashboard and PowerPoint deck builder
Monthly report and management review pack
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The records the ITPs ask for: setting-out, compaction, piling, pre-pour card, pour record and cube register, reinforcement, steel erection, bolting, welding and NDT, masonry, drainage test certificate, fire-stopping register, fire doors, roofing, cladding, air tightness, cable pull and termination, pipework and ductwork.
31 Excel records with form and worked example
Acceptance criteria on the form, pass/fail, NCR box, sign-off
Standards editions verified September 2026
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Materials & Procurement Control Pack · 16 documents
Materials & Procurement Control Pack
£195
Materials control plan with worked example, material approval schedule, certificate of conformity tracker, Declaration of Performance and UKCA/CE marking check, factory acceptance test records, long-lead tracker, delivery inspection checklists for ten material types, storage inspection, shelf-life register, traceability log.
Approval schedule, CofC and DoP trackers
FAT checklists and delivery checks by material
Traceability, storage, shelf-life and nonconformity records
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Thirty quality alerts in the Tier 1 format - what went wrong, why, what it cost, what the standard requires, the corrective action and the exact ITP line to add - across civils, envelope and MEP, plus alert template, capture form and register with trend analysis.
30 worked alerts, one to two pages each
ITP references resolve to real StructAssure ITP lines
Register and guide to run lessons learned to ISO 9001
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Complete management systems for a UK contractor: manual, procedures, forms, live registers, gap analysis tool and audit checklist, each supporting certification without conferring it.
3 products
A management system template is only useful if an auditor recognises the structure and a site team can run it. The ISO 45001 Construction OHSMS and the ISO 14001 Construction EMS are built to the same manual, procedure, form and register pattern as the ISO 9001 Construction QMS, so a contractor can implement one, two or all three as an integrated management system without rewriting anything. Each includes a clause-mapped manual and policy, a 90-day implementation roadmap, construction-specific procedures, forms, live Excel registers with formulas and date-driven formatting, a gap analysis tool and a full internal audit checklist. The OHSMS carries 18 procedures with every legal citation verified on legislation.gov.uk and hse.gov.uk; the EMS carries 16 procedures and a 46-obligation legal register with every statutory instrument number checked, plus a carbon and energy log on the current DESNZ conversion factors. These documents support certification by a UKAS-accredited body; they do not confer it, and the gap analysis tells you what is left to do.
ISO 9001:2015 · UK construction · 2026 transition kit included
ISO 9001 Construction QMS
£695one payment
The complete documented system for a UK contractor: quality manual, 21 procedures, 20 forms, 19 registers, internal audit programme, gap analysis tool and an implementation roadmap. 64 documents, independently audited against the standard before release.
Clause-mapped quality manual and policy
21 controlled procedures, construction-specific
20 forms and 19 registers (Word and Excel, unlocked)
Audit programme, checklists and management review pack
Gap analysis tool and 90-day implementation plan
ISO 9001:2026 Transition Kit included free, with its Revision 02 to follow
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
A complete occupational health and safety management system for a UK contractor: manual with 40-row clause map, policy, 90-day roadmap, 18 procedures, 12 forms, 10 live registers, gap analysis tool and 88-question audit checklist - cross-referenced to the Site Health & Safety Pack.
Every legal citation verified on legislation.gov.uk and hse.gov.uk
Registers with live formulas and date-driven conditional formatting
Supports certification; does not confer it
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
A complete environmental management system for a UK contractor: manual, policy, roadmap, 16 procedures, 11 forms, 10 registers including a 46-obligation legal register with every SI number verified, carbon and energy log on DESNZ 2025 factors, gap analysis tool and 83-question audit checklist.
46 UK obligations pre-populated and evaluated
Cross-referenced to the Environmental Site Pack
Supports certification; does not confer it
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The ISO 9001, ISO 45001 and ISO 14001 systems are built to the same manual, procedure and register structure, so a contractor can implement one, two or all three as a single integrated management system without rewriting anything.
Health, Safety & Environment
Site health and safety, policy and COSHH, RAMS, work at height, excavations and confined spaces, demolition and asbestos, traffic management, environmental, temporary works, lifting and fire safety packs, plus a full year of toolbox talks.
15 products
Construction health and safety documentation has to satisfy the principal contractor's adviser before the first hour of work and the HSE inspector afterwards, and generic templates fail both. The Site Health and Safety Pack gives a UK contractor 45 documents: ten permits to work, RAMS templates with worked examples, COSHH, manual handling, noise and HAVS assessments with calculators, twelve inspection registers, an induction pack, RIDDOR-ready incident forms and a site emergency plan. The Environmental and Sustainability Site Pack adds the CEMP, aspects and legal registers and a site waste management plan ready for Digital Waste Tracking. The Temporary Works Control Pack follows BS 5975-1:2024 with a temporary works register, design brief, category assessment tool and permits to load and strike. The Lifting Operations Pack covers BS 7121-1 and LOLER with four worked lift plans, and the Construction Site Fire Safety Pack follows the Joint Code of Practice and HSG168. Two toolbox talk libraries give forty weeks of briefings, each citing the regulation at its current edition.
Site Health & Safety Pack · 45 documents
Site Health & Safety Pack
£95
Ten permits to work, risk assessment and method statement templates with worked examples, COSHH, manual handling, noise and HAVS calculators, twelve inspection registers, induction pack, RIDDOR-ready incident forms, competence tracker and emergency plan.
10 permits and a permit register
RAMS, COSHH, noise and HAVS with worked examples
12 inspection registers, induction, incident and emergency documents
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Health & Safety Policy and COSHH Library · 29 documents
Health & Safety Policy and COSHH Library
£95
The written policy the Health and Safety at Work Act requires - template, worked example, review record and live arrangements index - plus twenty completed COSHH assessments with a verified EH40 exposure-limit lookup, a live COSHH register and a health surveillance log.
H&S policy template and worked example with 33 arrangements
20 completed COSHH assessments from cement and silica to isocyanates, lead and welding fume
COSHH register and health surveillance log with overdue flags
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Twenty paired risk assessments and method statements for the trades a principal contractor’s reviewer sees most: excavation, piling, concrete, steel, scaffold, roofing, cladding, brickwork, drylining, finishes, pipework, ductwork, electrical, fire alarm, demolition, asbestos, hot works, confined spaces, lifting and street works. Each is a full worked example, with the blank pair and the reviewer’s 20-point checklist.
Two-rating 5 × 5 risk assessments with the standards table at current edition
Method statements with hold points, emergency arrangements and stop-work triggers
Independently audited: 48 findings, all closed
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Procedure, risk assessment, permit, scaffold design brief and TG20 check, handover certificate, inspection registers, tower, MEWP and ladder checks, edge protection and net records, harness register with fall-clearance calculator, rescue plan, weather hold and scored weekly inspection - to the Work at Height Regulations, TG20:21 and BS EN 13374:2025.
21 documents, template plus worked example throughout
Live registers: inspection intervals, tag status, harness withdrawal and fall clearance computed
Rescue plan and permit cross-referenced to the RAMS Library and H&S pack
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Permit to dig with CAT and Genny record, trench support selection and design check, services survey, service strike procedure, inspection register with the regulation 24 report, dewatering and deep excavation logs, confined space risk assessment, entry permit, gas monitoring log, rescue plan and the registers that go with them.
21 documents, worked example beside every template
Trench support calculator and regulation 24 inspection register
Confined space entry permit, gas log with alarm flags and rescue plan
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Demolition and soft strip to BS 6187:2011, CDM 2015 and the Control of Asbestos Regulations 2012: procedure, pre-demolition survey, demolition plan with a full worked example, exclusion zones, party wall survey, asbestos management plan, licensable-or-not decision tool, work and health records, unexpected discovery procedure, registers, inspections and completion certificate.
Demolition plan and method statement with the Ellerby House worked example
Asbestos licensing decision tool, management plan and regulation 22 records
Services isolation, waste, monitoring and daily inspection registers
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Traffic Management & Site Logistics Pack · 16 documents
Traffic Management & Site Logistics Pack
£145
Site traffic management plan and logistics plan with worked examples, banksman appointment and competence record, reversing and blind-spot control, driver induction card, Chapter 8 layout tool and TTRO permit tracker, street works register, segregation checklist, delivery booking register, vehicle checks, weekly route inspection, incident report and CLOCS/FORS checklist.
Traffic management and logistics plans completed for a worked site layout
Chapter 8 layout selection from the Red Book table, TTRO and street works registers
Delivery register that flags clashes, and a CLOCS v5 / FORS v7.2 vehicle checklist
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Environmental & Sustainability Site Pack · 24 documents
Environmental & Sustainability Site Pack
£245
Construction environmental management plan with worked example, aspects and legal registers, site waste management plan and tracker, waste registers ready for Digital Waste Tracking, inspection and monitoring logs, spill procedure, incident and complaint registers.
CEMP to ISO 14001 with a full worked example
Legal register with 34 obligations pre-populated
Waste, noise, dust, water and fuel-storage records
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Twenty site safety briefings, each citing the actual regulation and HSE guidance at the current edition, with key points, questions for the crew and an attendance register. A year of toolbox talks ready to deliver.
20 talks from manual handling to temporary works
Law and guidance box on every talk
Attendance register and delivery guide
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Twenty trade-specific briefings - steel erection, roofing, demolition, piling rigs, concrete pumping, cartridge and power tools, welding fume, mobile towers, harness rescue, crane signalling, Chapter 8, dumpers, coring, glazing, solvents, deep trenches, live railway and highway, trailing leads and permit-to-work - each citing the regulation at its current edition.
20 talks TBT-41 to TBT-60 with attendance registers
Trigger table: which talk, RAMS and form to brief when a trade or plant item arrives
20-week programme that extends Volumes 1 and 2
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Twenty briefings on the people, health, quality and environmental topics that make a site run well - first aid, evacuation, new workers, language, PPE, dermatitis, 110 V, occupied premises, pollution, near-miss reporting, three quality talks, respect, heat stress, end-of-shift - plus the 52-week programme that sequences all 80 talks.
20 talks TBT-61 to TBT-80 with attendance registers
52-week annual programme: every talk from all four volumes once, phase-ordered
Three quality talks that point at the ITP, records and materials packs
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Procedure to BS 5975-1:2024, design brief with worked example, detailed register with status ladder, category assessment tool, design check certificate, TWC and TWS appointments, permits to load and strike, falsework, scaffold, excavation support, crane base and propping records.
Procedure, appointments and category assessment tool
Register with due and overdue formulas and dashboard
Permits and inspection checklists with worked examples
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Lifting procedure to BS 7121-1 and LOLER, appointments, four worked lift plans (mobile crane AHU lift, tower crane schedule, lorry loader, excavator), lift category tool, load and rigging calculator, ground bearing calculator, equipment register with examination scheme, pre-use checks, lift log and wind hold record.
Worked AHU lift plan checked line by line
Calculators with EN 13000 and EN 13001-2 wind bases
CPA CIG 2308 contract-lift route built in
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Construction phase fire safety plan with a full worked example, coordinator appointment, hot works procedure and register, extinguisher calculator, compartmentation tracker, flammables and LPG register, timber frame supplement, arson checklist, drill record, fire service liaison pack and Regulation 38 handover schedule.
Every clause cited to the JCoP 10th ed with Amendments 1 and 2 and HSG168
11 workbooks, 817 formulas, zero errors
Worked example corrected after independent review
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Running the site and the contract: planning and records, commercial administration, bids and tenders, design management and subcontractors.
6 products
Running a construction site and administering its contract generate more paperwork than any other part of the job, and it is the paperwork that decides claims. The Site Management, Planning and Records Pack provides the construction phase plan to CDM 2015 with an 11-page worked example, the site diary, labour, plant, delivery and weather records, site instructions, RFI, drawing and subcontractor registers, progress reports, minutes, action log and risk register, cross-referenced so an entry in one appears in the others. The Commercial and Contract Administration Pack covers early warnings and compensation events under NEC4 and JCT, dayworks, interim payment applications with the Construction Act notice tracker, retention, final account, CVR and cash flow. The Bid and Tender Pack holds 47 model PQQ answers under every Common Assessment Standard heading; the Subcontractor Management Pack is the same process from the buying side; and the Design and Information Management Pack brings the design responsibility matrix, CDE procedure and ISO 19650 naming into the same system.
Site Management, Planning & Records Pack · 29 documents
Site Management, Planning & Records Pack
£245
Construction phase plan with worked example, two-week look-ahead, mobilisation checklist, site diary, labour, plant, delivery and weather records, site instructions, drawing, RFI and subcontractor registers, progress reports, meeting minutes, action log and risk register.
Construction phase plan to CDM 2015 with 11-page worked example
Daily records and registers that cross-reference each other
Weekly and monthly reports, minutes, action and risk logs
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
The editable construction phase plan every principal contractor must have in place before work starts, structured to CDM 2015 regulation 12 with guidance in every field. Sold on its own or inside the Site Management, Planning & Records Pack.
Editable construction phase plan template (Word)
Structured to CDM 2015 regulation 12 and HSE L153
Comes with the free worked example
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Early warning and compensation event notices and registers, dayworks, interim payment application with the statutory notice tracker, retention and final account, CVR, cash flow, procurement schedule, subcontract enquiry, bid levelling, order and payment certificate, delay records.
Change control notices and registers (NEC4 and JCT)
Payment application and HGCRA notice tracker
CVR, cash flow, subcontract and claims records
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Model PQQ answers under every Common Assessment Standard heading, each pointing at the document that evidences it, tender quality submission templates, case study and CV templates with worked examples, bid/no-bid decision tool, tender tracker, clarification log, compliance checklist, settlement record, social value schedule.
47 model answers with evidence tables
Tender quality templates with worked paragraphs
Bid/no-bid tool, trackers and compliance checklist
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Design & Information Management Pack · 17 documents
Design & Information Management Pack
£145
Design management plan with worked example, design responsibility matrix, information required schedule, design risk register, gate review record, transmittals, CDE document control procedure with ISO 19650 naming and status codes, CDP tracker, technical query responses, change and freeze notices, clash register.
Design management plan and responsibility matrix
CDE procedure and naming convention builder
Change, freeze and coordination records with worked examples
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
PQQ and scoring sheet, insurance and compliance expiry tracker, onboarding checklist, RAMS review checklist, pre-start meeting record, competence verification, interface matrix, weekly monitoring, improvement notice, scorecard, panel review, close-out checklist, employment status, right to work and ethical labour records.
PQQ on Common Assessment Standard topics with scoring
Expiry tracker, onboarding and RAMS review checklists
Monitoring, scorecard, panel review and close-out
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Building Regulations and the Building Safety Act, handover and close-out, and plot and fit-out completion.
3 products
Compliance and handover documents are reviewed by people with statutory powers or a cheque to withhold, so they have to be complete on the day. The Building Regulations and Building Safety Act Compliance Pack (England) gives a contractor the compliance plan with worked examples for a standard and a higher-risk building, dutyholder appointments and competence records, the Approved Document matrix, Regulation 38 and golden thread schedules, Gateway 2 and Gateway 3 checklists, change control and mandatory occurrence reporting, with every regulation number and day count checked on legislation.gov.uk. The Handover and Close-Out Pack has a 131-line deliverables schedule across seven disciplines with the governing standard on each line, the snagging and defects register, practical completion checklist, handover certificate, certificate and warranty register and the CDM health and safety file checklist. The Housing and Fit-Out Completion Pack adds the 211-line plot completion checklist, the New Homes Quality Code pre-completion inspection record with the Code's complaint clocks, and CAT A and CAT B fit-out checklists.
Building Regulations & Building Safety Act Compliance Pack · 16 documents
Building Regulations & Building Safety Act Compliance Pack
£195England
Compliance plan with worked examples for a standard and a higher-risk building, dutyholder appointment and competence record, notices and inspections tracker, Approved Document matrix, Regulation 38 and golden thread schedules, HRB determination, Gateway 2 and 3 checklists, change control, mandatory occurrence reporting, compliance declarations.
Every regulation number and day count checked on legislation.gov.uk
Gateway 2 and 3 checklists line by line
Change control and mandatory occurrence reporting with examples
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Handover strategy, a deliverables schedule for every discipline with the governing standard on each line, snagging and defects register, practical completion checklist, handover certificate, rectification tracker, certificate and warranty register, CDM health and safety file checklist and lessons learned.
131-line deliverables schedule across seven disciplines
211-line plot completion checklist, pre-completion inspection record to the New Homes Quality Code, home demonstration record, plot certificate schedule, customer care log with the Code's complaint clock, handover certificate, CAT A and CAT B fit-out checklists, room-by-room sign-off, client walkround, warranty schedule.
Plot completion and certificate schedules
New Homes Quality Code inspection and customer care records
CAT A and CAT B fit-out completion checklists
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Every pack in one purchase, or a membership that keeps the documents current as the standards change.
2 products
The Complete Site Quality System is every StructAssure pack in one purchase: the ISO 9001 Construction QMS, the ISO 45001 and ISO 14001 systems, the project quality plan, all four ITP libraries and their check sheets, the ITP register and dashboard, both briefing sheet volumes, all four toolbox talk volumes, and the commissioning, commissioning tracker, handover, health and safety, policy and COSHH, work at height, excavations, demolition, traffic, environmental, temporary works, lifting, fire, site management, commercial, bid, design, subcontractor, compliance, housing, materials, records, audit and quality alert packs, with the ISO 9001:2026 transition kit. One fictional project, Northgate Business Park for Harland Construction Ltd, runs through every worked example, so the documents cross-reference each other correctly from the tender through to the handover certificate. It is delivered as the individual packs, so a revision to any one of them flows through your Payhip download link. For contractors who would rather keep current than buy once, the Standards Watch membership delivers the monthly bulletin from our register of more than 800 cited standards with every updated document, and All-Access adds every pack and every future pack for as long as you subscribe.
Complete Site Quality System · every pack
Complete Site Quality System
£1,995save 76% (£6,340) against buying the packs
Every StructAssure pack in one purchase: the ISO 9001, 45001 and 14001 systems, project quality plan, 60 ITPs with matching check sheets, 80 toolbox talks, 16 briefing sheets, RAMS, health and safety, work at height, excavations, demolition, traffic, environmental, temporary works, lifting, fire, commissioning, handover, site management, commercial, design, records and audit packs. One consistent system, tender to handover.
1,000 files across 45 packs
One worked-example project running through all of them
Delivered as the individual packs, so updates flow through
See sample pages
Rendered from the actual files in the pack. Click a page to open it full size.
Keep the documents current as the standards change. Standards Watch is the monthly bulletin from our register of 800+ cited standards, with the change log and every updated document. All-Access adds every pack now, every new pack and every update. Cancel any time.
Standards Watch£9/month or £79/year Monthly bulletin, change log and every updated document
All-Access£99/month or £995/year Every pack, every new pack, every update, plus the bulletin
All products are sold through our Payhip store: payhip.com/structassure. Payment is handled by Payhip; files are delivered immediately after checkout.
Why these are different
A blank grid is not a quality system.
Anyone can download an empty ISO 9001 template. The problem was never finding the table; it was knowing what to put in it, and that is exactly what gets a submission returned.
Compare a typical template's acceptance criterion, "works to be completed to a satisfactory standard in accordance with the specification", with the equivalent line here: "torqued to manufacturer value using calibrated tool and torque-marked; no exposed copper outside terminal; BS 7671 Cl. 526." The first is unmeasurable and uncitable. The second can be inspected, verified and audited.
Every worked example is written that way, because the author has sat on the reviewing side of that table as Quality Manager and Contractor's Responsible Engineer on major UK construction programmes.
Buy this if
A client or main contractor has asked for your quality system and you do not have one.
You are going for ISO 9001 certification and want the documentation done before the auditor arrives.
You are bidding framework or Tier 1 work and the quality section is costing you scores.
You want editable files you own, not a portal you rent.
Do not buy this if
You expect certification to arrive with the download. It will not.
You want someone to run the system for you. That is consultancy, and we offer it separately.
You will not read it. A system nobody opens fails its first audit.
Questions
Before you buy
Does buying the QMS make my company ISO 9001 certified?
No. These documents support your route to certification. They do not confer it. ISO 9001:2015 certification can only be granted by a UKAS-accredited certification body following audit. What the QMS gives you is the documented information the standard requires, written and structured so the audit is about your business rather than your paperwork. The gap analysis tool tells you what is left to do.
Can I edit the documents and add my own logo?
Yes. Everything is native Word and Excel, unlocked. Rebrand it, remove what does not apply, add what does. Unlimited use within your own company on as many projects as you like. You may not resell it or supply it to another company as your own product.
Is any of this taken from a client project?
No. Every document is authored from scratch against public standards: ISO 9001, ISO 10005, BS 7671, the Eurocodes and the other references cited in each line. No client's records, templates or intellectual property are reused.
How long does implementation take?
The 90-day roadmap in the QMS is written for a contractor with no full-time quality manager. Realistically: two weeks to brand and tailor, six weeks to get the system in use on a live job, and a further month of records before a certification audit is worth booking.
What is the refund position?
These are digital downloads, so a complete document is given away free first: read the free ITP and judge the standard before you spend anything. If a file is faulty, or a pack is missing something the listing promised, email within 7 days of purchase with your order number and it will be put right or refunded through Payhip.
Is there any support after I buy?
Yes. Every pack comes with 12 months of email support: ask how to apply any document to your project, what a reviewer will expect, or how to adapt a form, and a chartered construction professional answers, normally within one working day. Standards are watched for you too: when a cited edition changes, the revised documents are re-issued to your Payhip download page at no charge.
What if my trade is unusual?
The procedures suit any UK construction contractor and everything is editable. If you are unsure, email before you buy and you will get a straight answer on whether it fits, including a straight no.
Start here
Take the free ITP and judge the standard yourself.
One complete inspection and test plan, template and worked example. It costs an email address and it will tell you whether the rest is worth the money.
Certification. These documents support your route to certification. They do not confer it. ISO 9001:2015 certification can only be granted by a UKAS-accredited certification body following audit.